I have taken pics but have not had the time to upload them. Today I hired someone to go back and cover nail holes on the crown and baseboard and to do all the caulking and painting on the trim - (cased openings, doors, windows etc.
Unless I am badly mistaken, all I have to do now is a little minor grouting - a little bit of repair work - and I have to put down the 3/4 inch shoe mold on all the base that is sitting on tile. Then I have to put the interior wall board up in the garage. That should wrap me up.
Stuff that I am pretty sure will get done this week!
Master Shower glass will be installed.
Trim (all that stuff listed above) will get it's finish coat.
Concrete will get formed up and poured for sidewalks, outside garage pad, and some driveway.
Possibly get the garage door up
NEXT WEEK:
Carpet on Monday
WEEK AFTER THANKSGIVING:
Final work on closets and punch list.
Close on house and start moving in!